Building maintenance for Central Valley facilities, written for the heat

A preventive calendar for Fresno, Stockton and Modesto buildings that puts HVAC filters and coils on a tighter summer cadence, keeps lighting rounds on large warehouse floors, checks roofs and drains before the rainy season, and sends a technician the same day when something breaks.

A UFG technician in a navy UFG shirt kneels at a wall opened to its studs, with a step ladder and trash can beside him

Maintenance in the Central Valley

Summers over 100°F push HVAC harder than anywhere else we work, so valley calendars check filters monthly and coils quarterly, and the seasonal start-up happens in April, not June. Big floors mean lighting rounds matter: a dark aisle is a safety issue. Flat roofs and long drain runs get inspected before the first November storm.

Glowing pipes link a central office building to a fan, a lightning bolt, a bulb and a water drop in glass bubbles

What is included

Scope for Central Valley buildings

A UFG technician in a navy UFG shirt stands on a green ladder and reaches into an opened ceiling access panel
  • Preventive maintenance

    A written calendar by system and month, worked by our technicians and reported weekly.

  • HVAC

    Monthly filters in summer, quarterly coils and belts, April start-up, vendor coordination for compressors and refrigerant.

  • Electrical and lighting

    Lighting rounds on large floors, lamp and ballast replacement, outlets and switches, panel inspections.

  • Plumbing

    Fixtures, valves, drains, water heaters; leak response.

  • Structural and envelope

    Doors, dock hardware, drywall and paint, roof and drain checks before the rainy season.

  • Emergency repairs

    A direct line and the nearest technician the same day for clients.

From the people who do the work

Jose Gonzalez, Account Manager.

Super Bowl Sunday

Jose Gonzalez, Account Manager

Length English

Questions people ask

How do you keep HVAC running through a valley summer?

Monthly filter changes in summer, quarterly coil and belt checks, an April start-up, and a vendor on call for compressor and refrigerant work.

Do you do emergency repairs in Fresno or Stockton?

Yes. Clients have a direct line and we send the nearest valley technician the same day.

Can you maintain a warehouse with high-bay lighting?

Yes. Lighting rounds and lift-based lamp replacement are in the scope; LED retrofit planning where it pays back.

Do you inspect roofs?

We inspect roofs and clear drains before the rainy season and report; roofing repairs go to a roofing contractor.

Get a Central Valley maintenance calendar

Address, square footage and a rough equipment list. We walk the building and send a calendar and a price within one business day of the walk.

Two UFG team members in navy pullovers work in a commercial kitchen, one crouched scrubbing wall pipe valves with a sponge